Safety and performance tests of electrical installations before energization.
We carry out insulation resistance, earth resistance, relay testing, protection checks and functional tests on transformers, panels, cables and DG sets to make sure the system is safe to energize.
Electrical Testing & Pre-Commissioning is delivered by our experienced team using quality materials and approved methods, ensuring safety, reliability and compliance. Suitable for substations, panels, cables, dg sets, solar plants.
Safe energization
Calibrated instruments
Detailed test reports
Compliance with IS and CEA
Early fault detection
| Parameter | Specification |
|---|---|
| Tests | IR, earth resistance, continuity, hi-pot |
| Relay Testing | Secondary injection |
| Instruments | Megger, earth tester, relay kit |
| Standard | IS 732 / IS 3043 / CEA |
| Equipment | Transformer, VCB, panels, cables |
| Report | Signed test certificate |
*Values vary by project and selected model — final specification is confirmed at the time of quotation based on site requirements.
Share your flow, head, and site details — we'll recommend the right model and configuration.
Request a Quote